MCS Cabinet and Reservoir Skid

Lifting the MCS Cabinet from its original position using FPU Crane into E&I Building level 3. Then Lift it using Roller Lift (Rol-A-Lift) vertically through designated path until reach final placement area.

Lifting the Reservoir Skid from its initial position and tilting it to a horizontal orientation to avoid an overhead obstacle. A roller lift is then installed underneath, allowing the reservoir to be moved along a prepared path. It is subsequently tilted back to a vertical position, where skid rollers are installed to shift it over the grating and accurately place it at the designated location.